Call Us +27 21 941 5140

Sasol Boiler Hire

R200 million
Saving

“Collaboration is the best way to work. It’s the only way to work, really. Everyone’s there because they have a set of skills to offer across the board.” EMIL PRAGRAJ, Process Engineer”.

DATE: 2018


LOCATION: Sasolburg


SOLUTION PROVIDED : 1 x 2T/hr, 1 x 7T/hr, 1 x 14T/hr, 1 x 30T/hr package boilers, with ancillary equipment


Project Background

1 month continuous uptime was provided to 4 locations on the same site.  Along with 4 Oil-fired boilers, diesel generators for independant power supply, oil storage tanks with temporary bunding was provided.

These boilers were operated and supervised 24/7 by EP Steam resulting in a R200 million saving for Sasol.